CFA
Project: 16 x Tunnel Ventilated Broiler Sheds
Location: Rosedale, VIC
Duration: June 2020 – January 2022
Scope: Design, Supply, Deliver, Install, Commission, 24/7 Service (Complete Lifecycle)
Installation and Onsite Wiring of:
- 16 x Tunnel Ventilated Boilers Sheds (SKOV)
- 4 x Generators (Duty / Standby)
- 2 x Main Switchboards with ATS controls
- 2 x Amenities and Office Buildings
Supply:
- 16 x Main Ventilation Control Cabinets
- 16 x Equipment Winch Control Cabinets
Features:
- Complete SKOV Climate Control System
- ABB Switchgear
- VES Proprietary LED Mimic Display
- VES Low Heat Dissipation Controls
- VES Touch Screen Alarm System
- Backup Power Supplies
- Monitored Alarm System (Back to Base)